User Tools

Site Tools


geodetic:geodetic

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Last revisionBoth sides next revision
geodetic:geodetic [2017/06/08 11:42] – created pollgeodetic:geodetic [2018/09/12 07:53] cimo
Line 5: Line 5:
 **Deliverables** **Deliverables**
 |**Number**|**Title**|**Lead**|**Month Due**|**Document**| |**Number**|**Title**|**Lead**|**Month Due**|**Document**|
-|D6.1|New correlator data products|JIV-ERIC|12+|D6.1|New correlator data products|JIV-ERIC|28
-|D6.2|Software to deal with geodetic observing schedules|JIV-ERIC|18|+|D6.2|Software to deal with geodetic observing schedules|JIV-ERIC|12|{{:geodetic:jumping_jive_d6.2.pdf|PDF}}|
 |D6.3|Analysis of EVN station positions|CNRS|40| |D6.3|Analysis of EVN station positions|CNRS|40|
  
Line 12: Line 12:
 **Milestones** **Milestones**
 |**Number**|**Title**|**Lead**|**Month Due**| |**Number**|**Title**|**Lead**|**Month Due**|
-|MS17|New correlator data products|JIV-ERIC|12+|MS17|New correlator data products|JIV-ERIC|28
-|MS18|Software to deal with geodetic observing schedules|JIV-ERIC|18|+|MS18|Software to deal with geodetic observing schedules|JIV-ERIC|12|
 |MS19|Analysis of EVN station positions|CNRS|40| |MS19|Analysis of EVN station positions|CNRS|40|
 +
 +NOTE: dates of D6.1 and D6.2 (and corresponding MS17 and MS19) interchanged in contract amendment (Aug 2017).
 +
 +[[geodetic:restricted|Restricted section WP6]]
geodetic/geodetic.txt · Last modified: 2020/12/11 20:06 by pacocolomer

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki