Deliverables Table Revised for Period 2
DRAFT
note: this is the period1 table merged with the additions for period 2.
note: removed deliverbales indicated with strikethrough text
D# | A | AD# | Descrip | Plan | Actual | Status | Nature | DisLev |
---|---|---|---|---|---|---|---|---|
D1 | NA4 | NA4.01 | Creation of Public EXPReS web-site | 2 | 1 | 4 | O | PU |
D2 | JRA1 | J1.1 | Data acquisition requirements document | 2 | 3 | 4 | R | PU |
D3 | JRA1 | J1.2 | Protocols strategic document | 2 | 2 | 4 | R | PU |
D4 | NA2 | NA2.01 | EVN-NREN meeting No. 1 (under auspices of EXPReS) (minutes) | 3 | 6 | 4 | R | PP |
D5 | SA1 | SA1.1 | Central data link control, Correlator Control Code modifications (not documented) | 3 | 7 | 4 | D | PU |
D6 | NA3 | NA3.1 | First meeting of eVSAG under auspices of EXPReS (minutes) | 4 | 9 | 4 | R | PP |
D7 | NA4 | NA4.02 | Creation of EXPReS web-based management tools | 4 | 4 | 4 | O | PP |
D8 | JRA1 | J1.3 | Visualization software | 4 | —> | P | PU | |
D9 | JRA1 | J1.4 | Correlator design specification 1) | 5 | 3 | R | PU | |
D10 | NA4 | NA4.03 | Generation of PR material (phase 1: logos and posters, PowerPoint template, press releases and news clippings, brochure) | 6 | 1 | x | O | PU |
D11 | SA1 | SA1.2 | Job preparation utilities | 6 | 2 | D | PU | |
D12 | SA1 | SA1.3 | Fast/adaptive scheduling tools | 6 | 1 | D | PU | |
D13 | SA2 | SA2.01 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant CNIG-IGN | 6 | 9 | 4 | R | PU |
D14 | SA2 | SA2.02 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant MPIfR | 6 | 9 | 4 | R | PU |
D15 | SA2 | SA2.03 | Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina) (via protected link) | 6 | 9 | 4 | O | PU |
D16 | SA2 | SA2.04 | Feasibility study (via protected link) of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan ) | 6 | 9 | 4 | R | PU |
D17 | SA2 | SA2.05 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant VIRAC | 6 | 9 | 4 | R | PU |
D18 | SA2 | SA2.06 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant HRAO | 6 | 9 | 4 | R | PU |
D19 | SA2 | SA2.07 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo) | 6 | 9 | 4 | R | PU |
D20 | SA2 | SA2.08 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant TIGO | 6 | 9 | 4 | R | PU |
D21 | SA2 | SA2.09 | Feasibility study (via protected link) of the last-mile connection to AARNET for participant CSIRO | 6 | 9 | 4 | R | PU |
D22 | JRA1 | J1.5 | Overall design document | 6 | 0 | R | PU | |
D23 | JRA1 | J1.6 | eVLBI-Grid design document | 6 | 9 | 4 | R | PU |
D24 | JRA1 | J1.7 | eVLBI fringes PC-EVN (Month 7 Demo report) | 7 | 7 | 4 | D | PU |
D25 | JRA1 | J1.8 | LOFAR connection strategic document | 7 | 11 | 4 | R | PU |
D26 | JRA1 | J1.9 | Data acquisition design document | 8 | 11 | 4 | R | PU |
D27 | SA1 | SA1.4 | eMERLIN VSI interfaces design | 9 | 1 | P | PU | |
D28 | SA1 | SA1.5 | Selective data processor controls | 9 | 9 | 4 | D | PU |
D29 | SA2 | SA2.10 | e-VLBI test observations, Medicina (256 Mbps fringes) (science announcement) | 10 | 3 | 4 | R | PU |
D30 | JRA1 | J1.10 | eVLBI-Grid interface document | 10 | 10 | 4 | R | PU |
D31 | NA2 | n/a | NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2) | 24 | ||||
D32 | NA1 | NA1.01 | Annual report (incl. Financial information) to EC | 12 | R | PP | ||
D33 | NA2 | NA2.02 | NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1) | 12 | R | PP | ||
D34 | NA4 | NA4.04 | e-VLBI Demonstration and attendance at Network events (events, presentations) | 12 | 12 | x | O | PU |
D35 | SA1 | SA1.5 | Network Protocol decision: A Simulation model for e-VLBI traffic on network links in the Netherlands,Comparing Simulation and Network Monitoring Results, On Network Monitoring of end-to-end paths used for e-VLBI, UDP-like TCP | 12 | 2 | D | PU | |
D36 | SA1 | SA1.7 | Monitored information handling modules | 12 | → | D | PU | |
D37 | SA2 | SA2.011 | Equipment of the last-mile infrastructure for participant MRO | 12 | 5 | 4 | O | PU |
D38 | SA2 | SA2.12 | Construction and equipment of the last-mile infrastructure for participant CNIG-IGN | 12 | O | PU | ||
D39 | SA2 | SA2.13 | Construction and equipment of the last-mile infrastructure for participant MPIfR | 12 | O | PU | ||
D40 | SA1 | SA1.8 | Monitoring processes | 12 | 7 | 4 | D | PU |
D41 | JRA1 | J1.11 | Protocols performance report 2) | 13 | 15 | 3 | R | PU |
D42 | JRA1 | J1.12 | Software correlator core | 14 | 6 | 3 | P | PU |
D43 | JRA1 | J1.13 | Software data product | 15 | P | PU | ||
D44 | SA1 | SA1.10 | Real-time data processor control software (no document) | 15 | 4 | 4 | P | PU |
D45 | SA1 | SA1.9 | Tests using local Jodrell Bank home e-MERLIN telescope | 15 | → | D | PU | |
D46 | NA3 | NA3.2 | eVSAG meeting No. 2 | 16 | R | PP | ||
D47 | SA1 | SA1.11 | Real-time Pipeline | 16 | 9 | 4 | D | PU |
D48 | NA2 | NA2.03 | EVN-NREN meeting No. 2 | 18 | R | PP | ||
D49 | NA4 | NA4.05 | Generation of new PR material (phase 2: display stand and merchandise) | 18 | O | PU | ||
D50 | SA1 | SA1.12 | Visibility monitor | 18 | 4 | 4 | D | PU |
D51 | SA1 | SA1.13 | Tested software for operational improvements | 18 | 0 | D | PU | |
D52 | SA1 | SA1.14 | Test using remote e-MERLIN telescope | 18 | → | D | PU | |
D53 | SA1 | SA1.16 | VSI support software | 18 | 0 | D | PU | |
D54 | SA1 | SA1.15 | VSI Interfaces | 18 | 0 | D | PU | |
D55 | SA2 | SA2.14 | 10 Gbps link upgrade between MERLIN and JIVE | 18 | O | PU | ||
D56 | SA2 | SA2.15 | e-VLBI test observations, Metsahovi | 18 | 13 | 4 | R | PU |
D57 | SA2 | SA2.16 | Construction and equipment of the last-mile infrastructure for participant Shanghai | 18 | O | PU | ||
D58 | SA2 | SA2.17 | Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO | 18 | O | PU | ||
D59 | SA2 | SA2.18 | Construction and equipment of the last-mile infrastructure for participant Urumqi | 18 | O | PU | ||
D60 | SA2 | SA2.19 | Construction and equipment of the last-mile infrastructure for participant Miyun | 18 | O | PU | ||
D61 | SA2 | SA2.20 | Construction and equipment of the last-mile infrastructure for participant Kunming | 18 | O | PU | ||
D62 | SA2 | SA2.21 | Construction and equipment of the last-mile infrastructure for participant VIRAC | 18 | O | PU | ||
D63 | SA2 | SA2.22 | Equipment of the last-mile infrastructure for participant NAIC | 18 | O | PU | ||
D64 | SA2 | SA2.23 | Construction and equipment of the last-mile infrastructure for participant TIGO | 18 | O | PU | ||
D65 | SA2 | SA2.24 | AARNET connectivity enhancements | 18 | O | PU | ||
D66 | JRA1 | J1.14 | Data acquisition interface document | 18 | R | PU | ||
D67 | JRA1 | J1.15 | LOFAR station interface report | 18 | R | PU | ||
D68 | JRA1 | J1.16 | Software for workflow management | 18 | 2 | P | PU | |
D69 | SA2 | SA2.25 | Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia) | 20 | R | PU | ||
D70 | SA2 | SA2.26 | 10 Gbps link between UniMan and OSO for ultra-VLBI tests | 20 | O | PU | ||
D71 | SA1 | SA1.17 | Flexible local GE network | 21 | 1 | D | PU | |
D72 | SA2 | SA2.27 | e-VLBI test observations, Effelsberg | 21 | R | PU | ||
D73 | SA2 | SA2.28 | e-VLBI test observations, Metsahovi | 22 | R | PU | ||
D74 | SA2 | SA2.29 | e-VLBI test observations, Yebes | 22 | R | PU | ||
D75 | JRA1 | J1.17 | Software for correlation on cluster | 23 | 2 | P | PU | |
D76 | JRA1 | J1.18 | Data acquisition test report | 23 | R | PU | ||
D77 | JRA1 | J1.19 | Data acquisition prototype at telescope | 23 | P | PU | ||
D78 | JRA1 | J1.20 | Overall broadband demonstration | 23 | D | PU | ||
D79 | JRA1 | J1.21 | Software cluster correlation | 23 | P | PU | ||
D80 | JRA1 | J1.22 | First fringes software correlator | 23 | D | PU | ||
D81 | NA1 | NA1.02 | Annual report (incl. Financial information) to EC | 24 | R | PP | ||
D82 | NA2 | NA2.04 | NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2) | 24 | R | PP | ||
D83 | NA4 | NA4.06 | e-VLBI Demonstration and attendance at Network events. | 24 | O | PU | ||
D84 | SA1 | SA1.18 | Network monitoring tools | 24 | 0 | D | PU | |
D85 | SA1 | SA1.19 | Multiple e-MERLIN telescope tests | 24 | → | D | PU | |
D86 | SA2 | SA2.30 | Construction and equipment of the last-mile infrastructure for participant HartRAO | 24 | O | PU | ||
D87 | JRA1 | J1.23 | Software to collect distributed output | 24 | P | PU | ||
D88 | NA2 | NA2.05 | EVN-NREN meeting No. 3 | 26 | R | PP | ||
D89 | NA2 | NA2.06 | EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop | 26 | R | PU | ||
| | | | |
||||
D91 | NA3 | NA3.3 | eVSAG meeting No. 3 | 26 | R | PP | ||
D92 | JRA1 | J1.24 | Software to create data product from distributed correlation | 27 | P | PU | ||
D93 | JRA1 | J1.25 | Software routing | 29 | P | PU | ||
D94 | NA3 | NA3.4 | e-VLBI Workshop held in Onsala | 30 | O | PU | ||
D95 | SA1 | SA1.20 | Improved network applications | 30 | 0 | D | PU | |
D96 | SA1 | SA1.21 | Monitoring user interfaces | 30 | 7 | 4 | D | PU |
D97 | SA2 | SA2.31 | e-VLBI test observations, Urunqi | 30 | R | PU | ||
D98 | SA2 | SA2.32 | e-VLBI test observations, Mijun | 30 | R | PU | ||
D99 | SA2 | SA2.33 | e-VLBI test observations, Kunming | 30 | R | PU | ||
D100 | SA2 | SA2.34 | e-VLBI test observations, VIRAC | 30 | R | PU | ||
D101 | SA2 | SA2.35 | e-VLBI test observations, HRAO | 30 | R | PU | ||
D102 | SA2 | SA2.36 | e-VLBI test observations, NAIC, Arecibo | 30 | R | PU | ||
D103 | SA2 | SA2.37 | e-VLBI test observations, TIGO | 30 | R | PU | ||
D104 | SA2 | SA2.38 | Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia) | 30 | O | PU | ||
D105 | JRA1 | J1.26 | eMERLIN interface available | 30 | P | PU | ||
D106 | JRA1 | J1.27 | Fringes with new routing | 31 | D | PU | ||
D107 | NA3 | NA3.5 | Publication of e-VLBI Workshop proceedings | 32 | R | PU | ||
D108 | JRA1 | J1.28 | Software distributed correlation | 33 | P | PU | ||
D109 | JRA1 | J1.29 | First fringes Grid correlator | 34 | D | PU | ||
D110 | JRA1 | J1.30 | First fringes on FABRIC | 35 | D | PU | ||
D111 | NA1 | NA1.03 | Annual report (incl. Financial information) to EC | 36 | R | PP | ||
D112 | NA1 | NA1.04 | Final Report to Board and EC | 36 | R | PP | ||
D113 | NA1 | NA1.05 | Final Plan for using and disseminating knowledge | 36 | R | PP | ||
D114 | NA1 | NA1.06 | Implementation of the Gender Action Plan | 36 | R | PP | ||
D115 | NA1 | NA1.07 | Raising public participation and awareness | 36 | R | PU | ||
D116 | NA2 | NA2.07 | NA2 annual & Final reports | 36 | R | PP | ||
D117 | NA4 | NA4.07 | e-VLBI Demonstration and attendance at network events. | 36 | O | PU | ||
D118 | JRA1 | J1.31 | Final report | 36 | R | PU | ||
D119 | MRO | SA2.11 | Equipment of the last-mile infrastructure for participant MRO | 12 | ongoing | O | PU | |
D120 | CNIG-IGN | SA2.12 | Construction and equipment of the last-mile infrastructure for participant CNIG-IGN | 12 | ongoing | R | PU | |
D121 | MPIfR | SA2.13 | Construction and equipment of the last-mile infrastructure for participant MPIfR | 12 | ongoing | |||
D122 | JBO | DJ1.11a | Interim Protocols performance report | 13 | ||||
D123 | JIVE | DJ1.4 | Correlator design specification | 13 | ||||
D124 | JIVE | SA1.22 | Mark5 hardware upgrade | 16 | ||||
D125 | JIVE | DJ1.5 | Overall design document | 17 | ||||
D126 | JIVE | SA1.23 | Use of WSRT synthesis data for e-VLBI calibration | 17 | ||||
D127 | O/S | SA1.24 | Mark5A code modifications | 17 | ||||
D128 | O/S | SA1.25 | Mark5B code modifications | 17 | ||||
D129 | HRAO | SA2.06 | Feasibility study of the last-mile connection to the nearest NREN node for participant HRAO | 18 | ongoing | |||
D130 | MERLIN, JIVE | SA2.14 | 10 Gbps link upgrade between MERLIN and JIVE | 18 | pendent | |||
D131 | MRO | SA2.15 | e-VLBI test observations, Metsähovi | 18 | 13 | |||
D132 | AARNET, CSIRO | SA2.17 | Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO | 18 | ||||
D133 | VIRAC | SA2.21 | Construction and equipment of the last-mile infrastructure for participant VIRAC | 18 | ||||
D134 | TIGO | SA2.23 | Construction and equipment of the last-mile infrastructure for participant TIGO | 18 | ||||
D135 | AARNET | SA2.24 | AARNET connectivity enhancements | 18 | ||||
D136 | JIVE | SA1.26 | Investigating a 1024M sub-array | 20 | ||||
D137 | INAF | SA2.25 | Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia) | 20 | ||||
D138 | UniMan, OSO | SA2.26 | 10 Gbps link between UniMan and OSO for ultra-VLBI tests | 20 | ||||
D139 | JIVE | DJ1.3 | Visualization software | 21 | ||||
D140 | ShAO | SA2.16 | Construction and equipment of the last-mile infrastructure for participant Shanghai | 21 | ||||
D141 | ShAO | SA2.18 | Construction and equipment of the last-mile infrastructure for participant Urumqi | 21 | ||||
D142 | ShAO | SA2.19 | Construction and equipment of the last-mile infrastructure for participant Miyun | 21 | ||||
D143 | ShAO | SA2.20 | Construction and equipment of the last-mile infrastructure for participant Kunming | 21 | ||||
D144 | MPIfR | SA2.27 | e-VLBI test observations, Effelsberg | 21 | ||||
D145 | MRO, CSIRO | SA2.28 | e-VLBI test observations, Metsahovi / CSIRO | 22 | ||||
D146 | OAN | SA2.29 | e-VLBI test observations, Yebes | 22 | ||||
D147 | NAIC | SA2.22 | Equipment of the last-mile infrastructure for participant NAIC | 24 | ||||
D148 | JIVE | SA1.27 | Space craft tracking correlator mode | 27 | ||||
D149 | HRAO | SA2.30 | Construction and equipment of the last-mile infrastructure for participant HartRAO | 27 | ||||
D150 | JBO | DJ1.11b | Final Protocols performance report | 28 | ||||
D151 | JIVE | SA1.28 | On-the-fly fringe fitting | 28 | ||||
D152 | JIVE | SA1.29 | Real-time download and extraction of station information | 30 | ||||
D153 | VIRAC | SA2.34 | e-VLBI test observations, VIRAC | 30 | ||||
D154 | TIGO | SA2.37 | e-VLBI test observations, TIGO | 30 | ||||
D155 | INAF | SA2.38 | Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia) | 30 | ||||
D156 | JIVE | SA1.30 | Automated correlator diagnostics | 33 | ||||
D157 | ShAO | SA2.31 | e-VLBI test observations, Urunqi | 33 | ||||
D158 | ShAO | SA2.32 | e-VLBI test observations, Mijun | 33 | ||||
D159 | ShAO | SA2.33 | e-VLBI test observations, Kunming | 33 | ||||
D160 | HRAO | SA2.35 | e-VLBI test observations, HRAO | 33 | ||||
D161 | JIVE | SA1.31 | Removing/adding stations from the correlation process on the fly | 34 | ||||
D162 | JIVE | SA1.32 | Enhancements & additions to real-time pipeline | 36 | ||||
D163 | JIVE | SA1.33 | Enhancements & additions to existing monitoring tools | 36 | ||||
D164 | NAIC | SA2.36 | e-VLBI test observations, NAIC, Arecibo | 36 |