Tue 30 March 2010
Brussels, Belgium
Date | Description |
---|---|
30 March 2010 | Negotiation meeting |
15 April 2010 | Deadline for submitting a mature version of the DoW (Annex I) |
19 April 2010 | Deadline for submitting a mature version the GPF (an intermediate submission of the GPFs should be done asap in views of stabilising the A2.5 and A2.6 forms so that we can ask for signature as soon as they have been checked). |
26 April 2010 | End of negotiation |
The Commission provided feedback from the first negotiation meeting (as DOC) (as PDF document) reiterating the comments sent to us in the ESR and hearing feedback. Included are instructions on how to integrate the feedback in the upcoming DoW.
ppt | description | |
---|---|---|
ppt | final version, as presented (note, not all slides were visible, shown) | |
ppt | rev 27 | |
ppt | rev 22: end of afternoon sunday version. | |
ppt | rev 14: draft slides in prep for Contract Negotiation Meeting | |
ppt | Slides previously presented to EC during Evaluation Hearing. |
The EC mailed us the text of the Negotiation Mandate as an HTML file. This wiki does not allow us to upload that file format, so tt has also been converted to a PDF document.
After the hearings, the Commission provided us with the Evaluation Summary Report as a PDF document.
The Invitation to Attend Evaluation Hearings is available as a PDF document.