Note: see the end of this document for further information about the information in each of the columns.
D# | lead | A | AD# | Descrip | Plan | Actual | Status | Nature | DisLev |
---|---|---|---|---|---|---|---|---|---|
111 | JIVE | NA | 1.03 | Annual report (incl. Financial information) to EC 1) | 42 | 42 | 4 | R | PP |
112 | JIVE | NA | 1.04 | Final Report to Board and EC 2) | 42 | 42 | 4 | R | PP |
113 | JIVE | NA | 1.05 | Final Plan for using and disseminating knowledge 3) | 42 | 42 | 4 | R | PP |
114 | JIVE | NA | 1.06 | Implementation of the Gender Action Plan 4) | 42 | 42 | 4 | R | PP |
115 | JIVE | NA | 1.07 | Raising public participation and awareness 5) | 42 | 42 | 4 | R | PU |
200 | JIVE | NA | 1.08 | Month 42 Report (including financial information to EC) 6) | 42 | 42 | 4 | R | PU |
88 | DANTE | NA | 2.05 | EVN-NREN meeting No. 3 (with Madrid meeting) (slides for the EVN NREN meeting are posted on the meeting's website, scroll down to Thu 25 June 2009 for) 7) | 40 | 40 | 4 | R | PP |
89 | DANTE | NA | 2.06 | EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop ( slides for the EVN NREN meeting are posted on the meeting's website 8) | 40 | 40 | 4 | R | PU |
116 | DANTE | NA | 2.07 | NA2 annual & Final reports 9) 10) | 42 | 42 | 4 | R | PP |
91 | OSO | NA | 3.03 | eVSAG meeting No. 3 11) 12) | 40 | 40 | 4 | R | PP |
94 | OSO/CNIG | NA | 3.04 | e-VLBI Workshop to be held in Madrid workshop website 13) 14) | 40 | 40 | 4 | O | PU |
107 | JIVE | NA | 3.05 | Publication of e-VLBI Workshop proceedings POS online proceedings page 15) 16) | 42 | 42 | 4 | R | PU |
83 | JIVE | NA | 4.06 | e-VLBI Demonstration and attendance at Network events (months 13-24): APAN demonstration, presentations | 24 | 18 | x | O | PU |
117 | JIVE | NA | 4.07 | e-VLBI Demonstration and attendance at network events (months 25-42): TERENA 2008, HRAO e-VLBI inauguration, Effelsberg e-VLBI inauguration, IYA 2009 ( main site, EXPReS sub-page, press release, images and links), presentations | 36 | 30 | x | O | PU |
12 | JIVE | SA | 1.03 | Fast/adaptive scheduling tools 17) Dynamic scheduling of the e-EVN | 36 | 36 | 4 | D | PU |
27 | JBO | SA | 1.04 | eMERLIN VSI interfaces design 18) | 22 | 41 | 4 | P | PU |
36 | JIVE | SA | 1.07 | Monitored information handling modules 19) monitored_information_handling_modules.pdf | 42 | 42 | 4 | D | PU |
45 | JBO | SA | 1.09 | Tests using local Jodrell Bank home e-MERLIN telescope 20) 21) | 22 | 41 | 4 | D | PU |
52 | JBO | SA | 1.14 | Test using remote e-MERLIN telescope 22) 23) | 24 | 41 | 4 | D | PU |
53 | JIVE | SA | 1.16 | VSI support software 24) Gzipped tarfile of modified SU control code, Controlling the Mark5B playback unit from JCCS, Domino: Mark5B control software | 28 | 38 | 4 | D | PU |
85 | JBO | SA | 1.19 | Multiple e-MERLIN telescope tests 25) | 24 | 41 | 4 | D | PU |
95 | o/s | SA | 1.20 | Improved network applications 26) tarball of locally developed Mark5 control code jive5a history and download page packet and/or channel dropping | 27 | 30 | 4 | D | PU |
126 | JIVE | SA | 1.23 | Use of WSRT synthesis data for e-VLBI calibration | 17 | 22 | 4 | R | PU |
127 | o/s | SA | 1.24 | Mark5A code modifications 27) OS and application upgrade, from Debian Sarge to Debian Etch with SDK8.1 jive5a history and download page | 27 | 30 | 4 | ||
128 | o/s | SA | 1.25 | Mark5B code modifications 28) tarball of locally developed Mark5 control code Domino: Mark5B control software | 27 | 31 | 4 | ||
151 29) | JIVE | SA | 1.28 | On-the-fly fringe fitting On-the-fly clock searching | 28 | 28 | 4 | ||
152 | JIVE | SA | 1.29 | Real-time download and extraction of station information Monitoring the EVN via Field System logfiles | 30 | 32 | 4 | ||
156 | JIVE | SA | 1.30 | Automated correlator diagnostics Automatic diagonal weight detection, Automatic correlator diagnostics | 33 | 41 | 4 | ||
162 | JIVE | SA | 1.32 | Enhancements & additions to real-time pipeline 30) Enhancements to the easyJIVE web-driven post-processor tool | 42 | 42 | 4 | ||
163 | JIVE | SA | 1.33 | Enhancements & additions to existing monitoring tools 31) Extensions to the Data Status Monitor tool | 42 | 41 | 4 | ||
166 32) | JIVE | SA | 1.34 | Mixed-mode operations Tarball of locally developed Mark5 control code Mixed-mode operations | 38 | 35 | 4 | ||
167 | JIVE | SA | 1.35 | 1024 Mbps e-VLBI and beyond Throughput plot of e-VLBI run on October 19 2008, with the Effelsberg, Jodrell Bank and Westerbork radio telescopes transmitting data at a full 1024 Mbps, e-VLBI beyond the 1Gb/s speedbump, Metsahovi four-Gbps data recorder for VLBI and eVLBI , iBob data acquisition and network streaming | 40 | 36 | 4 | ||
129 | HRAO | SA | 2.06 | Feasibility study of the last-mile connection to the nearest NREN node for participant HRAO 33) 34) | 18 | 20 | x | R | PU |
130 | MERLIN,JIVE | SA | 2.14 | 10 Gbps link upgrade between MERLIN and JIVE 35) | 18 | 41 | 4 | O | PU |
57 | ShAO | SA | 2.16 | Construction and equipment of the last-mile infrastructure for participant Shanghai 36) test 1 APAN demo | 21 | 21 | 4 | O | PU |
59 | ShAO | SA | 2.18 | Construction and equipment of the last-mile infrastructure for participant Urumqi 37) 38) | 21 | 34 | 4 | O | PU |
133 | VIRAC | SA | 2.21 | Construction and equipment of the last-mile infrastructure for participant VIRAC pdf odt | 18 | 31 | 4 | O | PU |
63 | NAIC | SA | 2.22 | Equipment of the last-mile infrastructure for participant NAIC 39) 40) 41) | 24 | 28 | 4 | O | PU |
134 | TIGO | SA | 2.23 | Construction and equipment of the last-mile infrastructure for participant TIGO 42) | 18 | 28 | 4 | O | PU |
69 | INAF | SA | 2.25 | Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia) | 20 | 20 | x | R | PU |
70 | UniMan,OSO | SA | 2.26 | 10 Gbps link between UniMan and OSO for ultra-VLBI tests | 20 | 41 | 4 | O | PU |
72 | MPIfR | SA | 2.27 | e-VLBI test observations, Effelsberg PDF EVN Newsletter item 1 item 2 | 21 | 25 | 4 | R | PU |
74 | OAN | SA | 2.29 | e-VLBI test observations, Yebes | 22 | 38 | 4 | R | PU |
86 | HRAO | SA | 2.30 | Construction and equipment of the last-mile infrastructure for participant HartRAO APAN test observations | 27 | 27 | 4 | O | PU |
97 | ShAO | SA | 2.31 | e-VLBI test observations, Urumqi announcement 43) | 33 | 34 | 4 | R | PU |
153 | VIRAC | SA | 2.34 | e-VLBI test observations, VIRAC (short document regarding VIRAC's inability participate in e-VLBI, Status of Irbene site in e-VLBI) | 33 | 42 | 4 | R | PU |
101 | HRAO | SA | 2.35 | e-VLBI test observations, HRAO press release, EVN Tech Announcement, EVN Newsletter announcement , two fringe plots | 30 | 27 | 4 | R | PU |
102 | NAIC | SA | 2.36 | e-VLBI test observations, NAIC, Arecibo. Public announcement on web site | 30 | 28 | 4 | R | PU |
154 | TIGO | SA | 2.37 | e-VLBI test observations, TIGO. REUNA Announcement | 33 | 28 | 4 | R | PU |
155 | INAF | SA | 2.38 | Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia) Email Announcement, new Italian network map | 30 | 35 | 4 | O | PU |
78 | OSO | J | 1.02 | Overall broadband demonstration 44) | 40 | 41 | 4 | D | PU |
139 | JIVE | J | 1.03 | Visualization software 45) description visualisation software 46) | 38 | 42 | 4 | P | PU |
150 | JBO | J | 1.11b | Final Protocols performance report | 30 | 36 | 4 | ||
43 | JIVE | J | 1.13 | Software data product document 47) | 17 | 35 | 4 | P | PU |
66 | MPIfR | J | 1.14 | Data acquisition interface document 48) | 29 | 40 | 4 | R | PU |
67 | ASTRON | J | 1.15 | LOFAR station interface report- partial report complete report, informal form 49) | 21 | 35 | 4 | R | PU |
68 | PSNC | J | 1.16 | Software for workflow management ( early document, 2009 Jan documentation update). tgz'd Code drops ( drop #1, drop #2). 50). Additional documentation and integration report. | 18 | 34 | 4 | P | PU |
76 | MPIfR | J | | | | 4 | R | PU | |
77 | MRO/OSO | J | 1.19 | Data acquisition prototype at telescope report EVN News announcement 53) | 26 | 28 | 4 | P | PU |
79 | JIVE | J | 1.21 | Software cluster correlation (sfxc-0.0.6_deliverable_2_2_3.tar.gz, First fringes announcement) code drop 2 for 2009-jan. Final e-VLBI System Report (pdf) and final documentation package (tgz) (note, this is a comprehensive, HTML-based documentation of the libraries used on the software. Additional documentation is in the software itself) | 23 | 35 | 4 | P | PU |
87 | JIVE | J | 1.23 | Software to collect distributed output 54) PSNC report, Webservices Report and code drop | 32 | 37 | 4 | P | PU |
92 | JIVE | J | 1.24 | Software to create data product from distributed correlation 55) | 31 | 26 | 4 | P | PU |
93 | PSNC | J | 1.25 | Software routing (contained as part of tgz'd code drop #2). Additional documentation and integration report. | 29 | 34 | 4 | P | PU |
105 | JBO | J | 1.26 | eMERLIN interface available 56) | 30 | 35 | 4 | P | PU |
106 | JIVE | J | 1.27 | Fringes with new routing PDF 57) 58) 59) | 40 | 37 | 4 | D | PU |
108 | JIVE | J | 1.28 | Software distributed correlation | 33 | 36 | 4 | P | PU |
109 | JIVE | J | 1.29 | First fringes Grid correlator, and the PSNC report 60) 61) correlator software62) | 40 | 39 | 4 | D | PU |
110 | JIVE | J | 1.30 | First fringes on FABRIC | 35 | 35 | 4 | D | PU |
118 | JIVE | J | 1.31 | Final report 63) | 42 | 42 | 4 | R | PU |
76a | MPIfR | J | 1.32 | Data acquisition interface report (complete, deliverable combined with report for D66 “ Data acquisition interface”) | 36 | 40 | 4 | ||
76b 64) | MRO/OSO | J | 1.33 | Data acquisition interface report | 36 | 32 | 4 |
NOTE: The deliverables for Period 2 have been separated from the rest of the project to make the above table a bit smaller and easier to read.
NOTE: See the table above for deliverables from Period 2 to the end of the project.
D# | lead | A | AD# | Description | Plan | Actual | Status | Nature | DisLev |
---|---|---|---|---|---|---|---|---|---|
123 | JIVE | J | 1.04 | Correlator design specification | 13 | 16 | 4 | ||
122 | JBO | J | 1.11a | Interim Protocols performance report 65) | 13 | 15 | 4 | ||
42 | JIVE | J | 1.12 | Software correlator core | 15 | 6 | 4 | P | PU |
46 | OSO | NA | 3.02 | eVSAG meeting No. 2 | 16 | 15 | 4 | R | PP |
11 | JIVE | SA | 1.02 | Job preparation utilities | 16 | 16 | 4 | D | PU |
28 | SA1 | SA | 1.05 | Network Protocol decision: A Simulation model for e-VLBI traffic on network links in the Netherlands,Comparing Simulation and Network Monitoring Results, On Network Monitoring of end-to-end paths used for e-VLBI, UDP-like TCP | 16 | 20 | 4 | D | PU |
124 | JIVE | SA | 1.22 | Mark5 hardware upgrade | 16 | 20 | 4 | O | PU |
125 | JIVE | J | 1.05 | Overall design document | 17 | 23 | 4 | ||
48 | DANTE | NA | 2.03 | EVN-NREN meeting No. 2 | 18 | 20 | 4 | R | PP |
49 | JBO/JIVE | NA | 4.05 | Generation of new PR material (phase 2: display stand and merchandise) | 18 | 23 | 4 | O | PU |
51 | JIVE | SA | 1.13 | Tested software for operational improvements | 18 | 18 | 4 | D | PU |
71 | JIVE | SA | 1.17 | Flexible local GE network 66) | 18 | 19 | 4 | D | PU |
131 | MRO | SA | 2.15 | e-VLBI test observations, Metsahovi: quick report from month 13, MRO Test Observations | 18 | 13 | 4 | R | PU |
132 | AARNET, CSIRO | SA | 2.17 | Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO | 18 | 18 | 4 | O | PU |
135 | AARNET | SA | 2.24 | AARNET connectivity enhancements EVN Newsletter announcement | 18 | 18 | 4 | O | PU |
136 | JIVE | SA | 1.26 | Investigating a 1024M sub-array | 20 | 23 | 4 | R | PU |
73 | MRO, CSIRO | SA | 2.28 | e-VLBI test observations, Metsahovi | 22 | 20 | 4 | R | PU |
75 | JIVE | J | 1.17 | Software for correlation on cluster 67) | 23 | 23 | 4 | P | PU |
80 | JIVE | J | 1.22 | First fringes software correlator | 23 | 15 | 4 | D | PU |
54 | JIVE | SA | 1.15 | VSI Interfaces 68) | 23 | 16 | 4 | D | PU |
81 | JIVE | NA | 1.02 | Annual report (incl. Financial information) to EC | 24 | 24 | 4 | R | PP |
148 | JIVE | SA | 1.27 | Space craft tracking correlator mode | 27 | 20 | 4 | R | PU |
84 | JIVE | SA | 1.18 | Network monitoring tools Lightpath status monitoring69) | 30 | 24 | 4 | D | PU |
96 | SA1 | SA | 1.21 | Monitoring user interfaces | 30 | 7 | 4 | D | PU |
161 | JIVE | SA | 1.31 | Removing/adding stations from the correlation process on the fly | 34 | 20 | 4 | R | PU |
31 | DANTE | NA | 2.04 | NA2 annual report No. 2 (as part of EXPReS Ann. Rep) | 24 | 24 | 4 | R | PP |
| | | | | 33 | 4 | R | PU | |
| | | | | 33 | 4 | R | PU | |
| | | | | | 4 | | |
|
| | | | | | 4 | | |
NOTE: The deliverables for Period 1 have been separated from the rest of the project to make the above table a bit smaller and easier to read.
NOTE: See the table above for deliverables from Period 2 to the end of the project.
D# | lead | A | AD# | Description | Plan | Actual | Status | Nature | DisLev |
---|---|---|---|---|---|---|---|---|---|
2 | JRA1 | J | 1.01 | Data acquisition requirements document | 2 | 3 | 4 | R | PU |
3 | JRA1 | J | 1.02 | Protocols strategic document | 2 | 2 | 4 | R | PU |
1 | NA4 | NA | 4.01 | Creation of Public EXPReS web-site | 2 | 1 | 4 | O | PU |
4 | DANTE | NA | 2.01 | EVN-NREN meeting No. 1 (under auspices of EXPReS) (minutes) | 3 | 6 | 4 | R | PP |
5 | SA1 | SA | 1.01 | Central data link control, Correlator Control Code modifications (not documented) | 3 | 7 | 4 | D | PU |
6 | OSO | NA | 3.01 | First meeting of eVSAG under auspices of EXPReS (minutes) | 4 | 9 | 4 | R | PP |
7 | NA4 | NA | 4.02 | Creation of EXPReS web-based management tools | 4 | 4 | 4 | O | PP |
23 | JRA1 | J | 1.06 | eVLBI-Grid design document | 6 | 9 | 4 | R | PU |
10 | NA4 | NA | 4.03 | Generation of PR material (phase 1: logos and posters, PowerPoint template, press releases and news clippings, brochure) | 6 | 1 | x | O | PU |
13 | SA2 | SA | 2.01 | Feasibility study of the last-mile connection to the nearest NREN node for participant CNIG-IGN | 6 | 9 | 4 | R | PU |
14 | SA2 | SA | 2.02 | Feasibility study of the last-mile connection to the nearest NREN node for participant MPIfR | 6 | 9 | 4 | R | PU |
15 | SA2 | SA | 2.03 | Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina) | 6 | 9 | 4 | O | PU |
16 | SA2 | SA | 2.04 | Feasibility study of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan ) | 6 | 9 | 4 | R | PU |
17 | SA2 | SA | 2.05 | Feasibility study of the last-mile connection to the nearest NREN node for participant VIRAC | 6 | 9 | 4 | R | PU |
19 | SA2 | SA | 2.07 | Feasibility study of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo) | 6 | 9 | 4 | R | PU |
20 | SA2 | SA | 2.08 | Feasibility study of the last-mile connection to the nearest NREN node for participant TIGO | 6 | 9 | 4 | R | PU |
21 | SA2 | SA | 2.09 | Feasibility study of the last-mile connection to AARNET for participant CSIRO | 6 | 9 | 4 | R | PU |
24 | JRA1 | J | 1.07 | eVLBI fringes PC-EVN (Month 7 Demo report) | 7 | 7 | 4 | D | PU |
25 | JRA1 | J | 1.08 | LOFAR connection strategic document | 7 | 11 | 4 | R | PU |
26 | JRA1 | J | 1.09 | Data acquisition design document | 8 | 11 | 4 | R | PU |
35 | JIVE | SA | 1.06 | Selective data processor controls | 9 | 9 | 4 | D | PU |
30 | JRA1 | J | 1.10 | eVLBI-Grid interface document | 10 | 10 | 4 | R | PU |
29 | SA2 | SA | 2.10 | e-VLBI test observations, Medicina (256 Mbps fringes) (science announcement) | 10 | 3 | 4 | R | PU |
32 | JIVE | NA | 1.01 | Annual report (incl. Financial information) to EC 74) | 12 | 13 | 4 | R | PP |
33 | DANTE | NA | 2.02 | NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1) 75) | 12 | 13 | 4 | R | PP |
34 | NA4 | NA | 4.04 | e-VLBI Demonstration and attendance at Network events (events, presentations) | 12 | 12 | x | O | PU |
40 | SA1 | SA | 1.08 | Monitoring processes | 12 | 7 | 4 | D | PU |
44 | SA1 | SA | 1.10 | Real-time data processor control software (no document) | 15 | 4 | 4 | P | PU |
37 | MRO | SA | 2.11 | Equipment of the last-mile infrastructure for participant MRO | 12 | 5 | 4 | O | PU |
38 | CNIG-IGN | SA | 2.12 | Construction and equipment of the last-mile infrastructure for participant CNIG-IGN ( Feasibility study ) | 12 | 15 | 4 | O | PU |
39 | MPIfR | SA | 2.13 | Construction and equipment of the last-mile infrastructure for participant MPIfR ( Feasibility study Announcement) | 12 | 15 | 4 | O | PU |
47 | SA1 | SA | 1.11 | Real-time Pipeline | 16 | 9 | 4 | D | PU |
50 | SA1 | SA | 1.12 | Visibility monitor | 18 | 4 | 4 | D | PU |
D# == Deliverable # Actual == Actual Delivery Month \\ A == Activity Status == Current Status ( x of 4 ) \\ AD# == Activity Specific Deliverable Number Nature == Nature \\ Descrip == Deliverable description DisLev == Dissemination Level \\ Plan == Planned Delivery Month \\
“Status”
The status of the deliverable on a 0 to 4 scale. x = Ongoing effort 4 = Deliverable completed and presented to Project Manager 3 = Deliverable in draft form 2 = Most work completed 1 = Some work started 0 = No work started --> = Deliverable has been identified as actively delayed
“Nature”
R = Report P = Prototype D = Demonstrator O = Other
“Dissemination Level”
PU = Public PP = Restricted to other programme participants (including the Commission Services). RE = Restricted to a group specified by the consortium (including the Commission Services). CO = Confidential, only for members of the consortium (including the Commission Services).
“Removed deliverbales”
deliverables that have been officially removed are indicated with <del>strikethrough text</del>. Officially removed is determined by removal from the DOW as submitted to the EC.