====== Deliverables Table Revised for Period 2 ======
**DRAFT**
**note:** this is the period1 table merged with the additions for period 2.
**note:** this table is now sorted based on "PLAN" column
**note:** removed deliverbales indicated with strikethrough text
----
^ D# ^ A ^ AD# ^ Descrip ^ Plan ^ Actual ^ Status ^ Nature ^ DisLev ^
|D1|NA4|NA4.01|[[http://www.expres-eu.org/|Creation of Public EXPReS web-site]] | 2 | 1 | 4 | O | PU |
|D2|JRA1|J1.1|{{:expres:2006-05-05_daqreqs.pdf|Data acquisition requirements document}}| 2 | 3 | 4 | R | PU |
|D3|JRA1|J1.2|{{:expres:fabricprotocols1.2.1.001.pdf|Protocols strategic document}}| 2 | 2 | 4 | R | PU |
|D4|NA2|NA2.01|EVN-NREN meeting No. 1 (under auspices of EXPReS) ({{:expres:4th_evn-nren_meeting_minutes.doc|minutes}}) | 3 | 6 | 4 | R | PP |
|D5|SA1|SA1.1|[[http://www.jive.nl/~jive_cc/sin/sin5.pdf|Central data link control]], Correlator Control Code modifications (not documented)| 3 | 7 | 4 | D | PU |
|D6|NA3|NA3.1|First meeting of eVSAG under auspices of EXPReS ({{:expres:management:evsagmin-2006nov.pdf|minutes}}) | 4 | 9 | 4 | R | PP |
|D7|NA4|NA4.02|[[http://www.jive.nl/dokuwiki/doku.php/expres:expres|Creation of EXPReS web-based management tools]]| 4 | 4 | 4 | O | PP |
|**D8**|JRA1|J1.3|Visualization software| 4 | | ---> |P|PU|
|**D9**|JRA1|J1.4|Correlator design specification ((Document is in final form, but has not yet been uploaded to the wiki. Once uploaded, the deliverable will be considered complete)) |5| | 3 |R|PU|
|D10|NA4|NA4.03|Generation of PR material (phase 1: [[http://www.expres-eu.org/docs.html|logos and posters]], [[expres:outreach|PowerPoint template]], [[http://www.expres-eu.org/news.html|press releases and news clippings]], [[http://www.jive.nl/dokuwiki/doku.php/expres:outreach|brochure]]) | 6 | 1 | x | O | PU |
|**D11**|SA1|SA1.2|[[http://www.jive.nl/~jive_cc/sin/sin9.pdf|Job preparation utilities]] | 6 | | 2 | D | PU |
|**D12**|SA1|SA1.3|Fast/adaptive scheduling tools| 6 | | 1 | D | PU |
|D13|SA2|SA2.01|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant CNIG-IGN| 6 | 9 | 4 | R | PU |
|D14|SA2|SA2.02|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant MPIfR | 6 | 9 | 4 | R | PU |
|D15|SA2|SA2.03|Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina) ([[expres:management:mt|via protected link]]) | 6 | 9 | 4 | O | PU |
|D16|SA2|SA2.04|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan )| 6 | 9 | 4 | R | PU |
|D17|SA2|SA2.05|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant VIRAC| 6 | 9 | 4 | R | PU |
|D18|SA2|SA2.06|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant HRAO| 6 | 9 | 4 | R | PU |
|D19|SA2|SA2.07|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo)| 6 | 9 | 4 | R | PU |
|D20|SA2|SA2.08|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to the nearest NREN node for participant TIGO| 6 | 9 | 4 | R | PU |
|D21|SA2|SA2.09|Feasibility study ([[expres:management:mt|via protected link]]) of the last-mile connection to AARNET for participant CSIRO| 6 | 9 | 4 | R | PU |
|**D22**|JRA1|J1.5|Overall design document|6| | 0 |R|PU|
|D23|JRA1|J1.6|{{:fabric:grid_vlbi_design_v1.0_final.pdf|eVLBI-Grid design document}}| 6 | 9 | 4 | R | PU |
|D24|JRA1|J1.7|{{:fabric:fabric1_2_3_month7jec3.pdf|eVLBI fringes PC-EVN}} (Month 7 Demo report) | 7 | 7 | 4 | D | PU |
|D25|JRA1|J1.8|{{:fabric:lofar_-_connection_strategic_document_1.3.doc|LOFAR connection strategic document}}| 7 | 11 | 4 | R | PU |
|D26|JRA1|J1.9|{{:expres:management:data_acquisition_design.pdf|Data acquisition design document}}| 8 | 11 | 4 | R | PU |
|**D27**|SA1|SA1.4|eMERLIN VSI interfaces design| 9 | | 1 | P | PU |
|D28|SA1|SA1.5|[[http://www.jive.nl/~jive_cc/sin/sin6.pdf|Selective data processor controls]]| 9 | 9 | 4 | D | PU |
|D29|SA2|SA2.10|e-VLBI test observations, Medicina ([[http://www.expres-eu.org/evlbi.html#18May06|256 Mbps fringes]]) ([[http://www.ira.inaf.it/evnnews/#three|science announcement]])| 10 | 3 | 4 | R | PU |
|D30|JRA1|J1.10|{{:expres:management:dj1.10_evlbi-grid_interface_document_v1.0.doc|eVLBI-Grid interface document}} | 10 | 10 | 4 | R | PU |
|D119|MRO|SA2.11|Equipment of the last-mile infrastructure for participant MRO|12| |ongoing|O|PU|
|D120|CNIG-IGN|SA2.12|Construction and equipment of the last-mile infrastructure for participant CNIG-IGN|12| |ongoing|R|PU|
|D121|MPIfR|SA2.13 |Construction and equipment of the last-mile infrastructure for participant MPIfR|12| |ongoing| | |
|D32|NA1|NA1.01|Annual report (incl. Financial information) to EC |12| | |R|PP|
|D33|NA2|NA2.02|NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1)|12| | |R|PP|
|D34|NA4|NA4.04|e-VLBI Demonstration and attendance at Network events ([[http://www.expres-eu.org/events.html|events]], [[http://www.expres-eu.org/papers.html|presentations]])| 12 | 12 | x | O | PU |
|**D35**|SA1|SA1.5|Network Protocol decision: [[http://www.jive.nl/dokuwiki/lib/exe/fetch.php/expres:sansa_jive_sim_evlbi_workshop2.pdf|A Simulation model for e-VLBI traffic on network links in the Netherlands]],[[http://www.jive.nl/dokuwiki/lib/exe/fetch.php/expres:sansa_jive_tests_sim1.pdf|Comparing Simulation and Network Monitoring Results]], [[http://www.jive.nl/dokuwiki/lib/exe/fetch.php/expres:sansa_net_mon_report_draft8.pdf|On Network Monitoring of end-to-end paths used for e-VLBI]], [[http://www.jive.nl/dokuwiki/lib/exe/fetch.php/expres:protocols.pdf|UDP-like TCP]]| 12 | | 2 | D | PU |
|**D36**|SA1|SA1.7|Monitored information handling modules| 12 | | -> | D | PU |
|D37|SA2|SA2.011|Equipment of the last-mile infrastructure for participant MRO| 12 | 5 | 4 |O|PU|
|**D38**|SA2|SA2.12|Construction and equipment of the last-mile infrastructure for participant CNIG-IGN|12| | |O|PU|
|**D39**|SA2|SA2.13 |Construction and equipment of the last-mile infrastructure for participant MPIfR|12| | |O|PU|
|D40|SA1|SA1.8|[[http://www.jive.nl/~jive_cc/sin/sin3.pdf|Monitoring processes]]| 12 | 7 | 4 | D | PU |
|D122|JBO|DJ1.11a|Interim Protocols performance report|13| | | | |
|D123|JIVE|DJ1.4|Correlator design specification|13| | | | |
|D41|JRA1|J1.11|{{expres:management:d41-2007jun-eu_report_v3-1.doc|Protocols performance report}} ((comments on this draft are very much appreciated by the authors)) | 13 | 15 | 3 | R | PU |
|D42|JRA1|J1.12|{{:expres:management:d42-software_correlator_core.doc|Software correlator core}} | 14 | 6 | 3 | P | PU |
|D43|JRA1|J1.13|Software data product|15| | |P|PU|
|D44|SA1|SA1.10|Real-time data processor control software (no document)| 15 | 4 | 4 | P | PU |
|D45|SA1|SA1.9|Tests using local Jodrell Bank home e-MERLIN telescope| 15 | | -> | D | PU |
|D124|JIVE|SA1.22|Mark5 hardware upgrade|16| | | | |
|D46|NA3|NA3.2|eVSAG meeting No. 2|16| | |R|PP|
|D47|SA1|SA1.11|[[http://www.jive.nl/~jive_cc/sin/sin7.pdf|Real-time Pipeline]]| 16 | 9 | 4 | D | PU |
|D125|JIVE|DJ1.5|Overall design document|17| | | | |
|D126|JIVE|SA1.23|Use of WSRT synthesis data for e-VLBI calibration|17| | | | |
|D127|O/S|SA1.24|Mark5A code modifications |17| | | | |
|D128|O/S|SA1.25|Mark5B code modifications |17| | | | |
|D129|HRAO|SA2.06|Feasibility study of the last-mile connection to the nearest NREN node for participant HRAO|18| |ongoing| | |
|D130|MERLIN, JIVE|SA2.14|10 Gbps link upgrade between MERLIN and JIVE|18| |pendent| | |
|D131|MRO|SA2.15|e-VLBI test observations, Metsähovi|18|13| | | |
|D132|AARNET, CSIRO|SA2.17|Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO|18| | | | |
|D133|VIRAC|SA2.21 |Construction and equipment of the last-mile infrastructure for participant VIRAC|18| | | | |
|D134|TIGO|SA2.23 |Construction and equipment of the last-mile infrastructure for participant TIGO|18| | | | |
|D135|AARNET|SA2.24|AARNET connectivity enhancements|18| | | | |
|D48|NA2|NA2.03|EVN-NREN meeting No. 2 |18| | |R|PP|
|D49|NA4|NA4.05 |Generation of new PR material (phase 2: display stand and merchandise)|18| | |O|PU|
|D50|SA1|SA1.12|[[http://www.jive.nl/~jive_cc/sin/sin2.pdf|Visibility monitor]]| 18 | 4 | 4 | D | PU |
|D51|SA1|SA1.13|Tested software for operational improvements| 18 | | 0 | D | PU |
|D52|SA1|SA1.14|Test using remote e-MERLIN telescope| 18 | | -> | D | PU |
|D53|SA1|SA1.16 |VSI support software| 18 | | 0 | D | PU |
|D54|SA1|SA1.15 |VSI Interfaces| 18 | | 0 | D | PU |
|D55|SA2|SA2.14|10 Gbps link upgrade between MERLIN and JIVE|18| | |O|PU|
|D56|SA2|SA2.15|e-VLBI [[expres:d56-quick_report|test observations, Metsahovi]]| 18 | 13 | 4 | R | PU |
|D57|SA2|SA2.16|Construction and equipment of the last-mile infrastructure for participant Shanghai|18| | |O|PU|
|D58|SA2|SA2.17 |Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO|18| | |O|PU|
|D59|SA2|SA2.18|Construction and equipment of the last-mile infrastructure for participant Urumqi|18| | |O|PU|
|D60|SA2|SA2.19 |Construction and equipment of the last-mile infrastructure for participant Miyun|18| | |O|PU|
|D61|SA2|SA2.20 |Construction and equipment of the last-mile infrastructure for participant Kunming|18| | |O|PU|
|D62|SA2|SA2.21 |Construction and equipment of the last-mile infrastructure for participant VIRAC|18| | |O|PU|
|D63|SA2|SA2.22 |Equipment of the last-mile infrastructure for participant NAIC|18| | |O|PU|
|D64|SA2|SA2.23 |Construction and equipment of the last-mile infrastructure for participant TIGO|18| | |O|PU|
|D65|SA2|SA2.24|AARNET connectivity enhancements|18| | |O |PU|
|D66|JRA1|J1.14|Data acquisition interface document|18| | |R|PU|
|D67|JRA1|J1.15|LOFAR station interface report|18| | |R|PU|
|D68|JRA1|J1.16|Software for workflow management|18| | 2 |P|PU|
|D136|JIVE|SA1.26|Investigating a 1024M sub-array|20| | | | |
|D137|INAF|SA2.25|Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia)|20| | | | |
|D138|UniMan, OSO|SA2.26 |10 Gbps link between UniMan and OSO for ultra-VLBI tests|20| | | | |
|D69|SA2|SA2.25|Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia)|20| | |R|PU|
|D70|SA2|SA2.26 |10 Gbps link between UniMan and OSO for ultra-VLBI tests|20| | |O|PU|
|D139|JIVE|DJ1.3|Visualization software|21| | | | |
|D140|ShAO|SA2.16|Construction and equipment of the last-mile infrastructure for participant Shanghai|21| | | | |
|D141|ShAO|SA2.18|Construction and equipment of the last-mile infrastructure for participant Urumqi|21| | | | |
|D142|ShAO|SA2.19 |Construction and equipment of the last-mile infrastructure for participant Miyun|21| | | | |
|D143|ShAO|SA2.20 |Construction and equipment of the last-mile infrastructure for participant Kunming|21| | | | |
|D144|MPIfR|SA2.27|e-VLBI test observations, Effelsberg|21| | | | |
|D71|SA1|SA1.17 |Flexible local GE network| 21 | | 1 | D | PU |
|D72|SA2|SA2.27|e-VLBI test observations, Effelsberg|21| | |R|PU|
|D145|MRO, CSIRO|SA2.28|e-VLBI test observations, Metsahovi / CSIRO|22| | | | |
|D146|OAN|SA2.29|e-VLBI test observations, Yebes|22| | | | |
|D73|SA2|SA2.28|e-VLBI test observations, Metsahovi|22| | |R|PU|
|D74|SA2|SA2.29|e-VLBI test observations, Yebes|22| | |R|PU|
|D75|JRA1|J1.17|Software for correlation on cluster|23| | 2 |P|PU|
|D76|JRA1|J1.18|Data acquisition test report|23| | |R|PU|
|D77|JRA1|J1.19|Data acquisition prototype at telescope|23| | |P|PU|
|D78|JRA1|J1.20|Overall broadband demonstration|23| | |D|PU|
|D79|JRA1|J1.21|Software cluster correlation|23| | |P|PU|
|D80|JRA1|J1.22|First fringes software correlator|23| | |D|PU|
|D147|NAIC|SA2.22 |Equipment of the last-mile infrastructure for participant NAIC|24| | | | |
|D31|NA2|n/a|NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)|24| | | | |
|D81|NA1|NA1.02|Annual report (incl. Financial information) to EC |24| | |R|PP|
|D82|NA2|NA2.04|NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)|24| | |R|PP|
|D83|NA4|NA4.06 |e-VLBI Demonstration and attendance at Network events.|24| | |O|PU|
|D84|SA1|SA1.18|Network monitoring tools| 24 | | 0 | D | PU |
|D85|SA1|SA1.19|Multiple e-MERLIN telescope tests| 24 | | -> | D | PU |
|D86|SA2|SA2.30 |Construction and equipment of the last-mile infrastructure for participant HartRAO|24| | |O|PU|
|D87|JRA1|J1.23|Software to collect distributed output|24| | |P|PU|
|D88|NA2|NA2.05|EVN-NREN meeting No. 3|26| | |R|PP|
|D89|NA2|NA2.06|EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop |26| | |R|PU|
|D91|NA3|NA3.3|eVSAG meeting No. 3|26| | |R|PP|
|D148|JIVE|SA1.27|Space craft tracking correlator mode|27| | | | |
|D149|HRAO|SA2.30 |Construction and equipment of the last-mile infrastructure for participant HartRAO|27| | | | |
|D92|JRA1|J1.24|Software to create data product from distributed correlation |27| | |P|PU|
|D150|JBO|DJ1.11b|Final Protocols performance report|28| | | | |
|D151|JIVE|SA1.28|On-the-fly fringe fitting|28| | | | |
|D93|JRA1|J1.25|Software routing|29| | |P|PU|
|D100|SA2|SA2.34|e-VLBI test observations, VIRAC|30| | |R|PU|
|D101|SA2|SA2.35|e-VLBI test observations, HRAO|30| | |R|PU|
|D102|SA2|SA2.36|e-VLBI test observations, NAIC, Arecibo|30| | |R|PU|
|D103|SA2|SA2.37|e-VLBI test observations, TIGO|30| | |R|PU|
|D104|SA2|SA2.38 |Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia)|30| | |O|PU|
|D105|JRA1|J1.26|eMERLIN interface available|30| | |P|PU|
|D152|JIVE|SA1.29|Real-time download and extraction of station information|30| | | | |
|D153|VIRAC|SA2.34|e-VLBI test observations, VIRAC|30| | | | |
|D154|TIGO|SA2.37|e-VLBI test observations, TIGO|30| | | | |
|D155|INAF|SA2.38 |Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia)|30| | | | |
|D94|NA3|NA3.4|e-VLBI Workshop held in Onsala|30| | |O|PU|
|D95|SA1|SA1.20 |Improved network applications| 30 | | 0 | D | PU |
|D96|SA1|SA1.21|[[http://www.jive.nl/~jive_cc/sin/sin3.pdf|Monitoring user interfaces]]| 30 | 7 | 4 | D | PU |
|D97|SA2|SA2.31|e-VLBI test observations, Urunqi|30| | |R|PU|
|D98|SA2|SA2.32|e-VLBI test observations, Mijun|30| | |R|PU|
|D99|SA2|SA2.33|e-VLBI test observations, Kunming|30| | |R|PU|
|D106|JRA1|J1.27|Fringes with new routing|31| | |D|PU|
|D107|NA3|NA3.5|Publication of e-VLBI Workshop proceedings|32| | |R|PU|
|D108|JRA1|J1.28 |Software distributed correlation|33| | |P|PU|
|D156|JIVE|SA1.30|Automated correlator diagnostics|33| | | | |
|D157|ShAO|SA2.31|e-VLBI test observations, Urunqi|33| | | | |
|D158|ShAO|SA2.32|e-VLBI test observations, Mijun|33| | | | |
|D159|ShAO|SA2.33|e-VLBI test observations, Kunming|33| | | | |
|D160|HRAO|SA2.35|e-VLBI test observations, HRAO|33| | | | |
|D109|JRA1|J1.29|First fringes Grid correlator|34| | |D|PU|
|D161|JIVE|SA1.31|Removing/adding stations from the correlation process on the fly|34| | | | |
|D110|JRA1|J1.30 |First fringes on FABRIC|35| | |D|PU|
|D111|NA1|NA1.03 |Annual report (incl. Financial information) to EC |36| | |R|PP|
|D112|NA1|NA1.04 |Final Report to Board and EC |36| | |R|PP|
|D113|NA1|NA1.05 |Final Plan for using and disseminating knowledge|36| | |R|PP|
|D114|NA1|NA1.06|Implementation of the Gender Action Plan|36| | |R|PP|
|D115|NA1|NA1.07|Raising public participation and awareness |36| | |R|PU|
|D116|NA2|NA2.07|NA2 annual & Final reports |36| | |R|PP|
|D117|NA4|NA4.07 |e-VLBI Demonstration and attendance at network events. | 36| | |O|PU|
|D118|JRA1|J1.31|Final report|36| | |R|PU|
|D162|JIVE|SA1.32|Enhancements & additions to real-time pipeline|36| | | | |
|D163|JIVE|SA1.33|Enhancements & additions to existing monitoring tools|36| | | | |
|D164|NAIC|SA2.36|e-VLBI test observations, NAIC, Arecibo|36| | | | |
|D90|NA2|n/a|EVN-NREN meeting | n/a | | | | |