tog:june-2024-goteborg
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
tog:june-2024-goteborg [2024/05/22 22:21] – verkouter | tog:june-2024-goteborg [2024/06/11 06:42] – verkouter | ||
---|---|---|---|
Line 13: | Line 13: | ||
* Start of the meeting 9:00 CET | * Start of the meeting 9:00 CET | ||
* Introduction, | * Introduction, | ||
+ | * Update by the TOG Chair (**Poppi**) | ||
* Performance of the EVN (**Oh**) | * Performance of the EVN (**Oh**) | ||
* Report from stations | * Report from stations | ||
Line 20: | Line 21: | ||
- DBBC3 status (**all**) | - DBBC3 status (**all**) | ||
- DBBC3 (e-VLBI) tests (**Eldering**) | - DBBC3 (e-VLBI) tests (**Eldering**) | ||
+ | - 8-bit per sample tests (**Yang**) | ||
- flexbuf / recorder can do >> 8 Gbps? (**all**) | - flexbuf / recorder can do >> 8 Gbps? (**all**) | ||
* System and network management at JIVE (**Buijs**) | * System and network management at JIVE (**Buijs**) | ||
* Recorder status? | * Recorder status? | ||
+ | - NcFTP station-> | ||
+ | * RFI monitoring, CRAF, SpaceX/ | ||
* Field System status/ | * Field System status/ | ||
* VLBA/NRAO update (**Hunt**) | * VLBA/NRAO update (**Hunt**) |
tog/june-2024-goteborg.txt · Last modified: 2024/07/22 14:26 by verkouter