tog:june-2024-goteborg [2024/05/21 14:26] verkoutertog:june-2024-goteborg [2024/05/21 14:26] verkouter
Line 13: Line 13:
   * Start of the meeting 9:00 CET   * Start of the meeting 9:00 CET
   * Introduction, Action Items   * Introduction, Action Items
-  * Performance of the EVN (Oh)+  * Performance of the EVN (**Oh**)
   * Report from stations   * Report from stations
-     - wide-band C/X status (all) +     - wide-band C/X status (**all**
-     - triband receiver status (all) +     - triband receiver status (**all**
-       - BRAND receiver integration tests at Effelsberg (Rahimi) +       - BRAND receiver integration tests at Effelsberg (**Rahimi**
-     - DBBC3 status (all) +     - DBBC3 status (**all**
-       - DBBC3 (e-VLBI) tests (Eldering) +       - DBBC3 (e-VLBI) tests (**Eldering**
-     - flexbuf / recorder can do >> 8 Gbps? (all) +     - flexbuf / recorder can do >> 8 Gbps? (**all**
-  * System and network management at JIVE (Buijs)+  * System and network management at JIVE (**Buijs**)
   * Recorder status?   * Recorder status?
   * Field System status/updates?   * Field System status/updates?